New Construction Salt Lake City

Posted on

New Construction Salt Lake City – Interested in seeing where developers are proposing and building new housing developments in Salt Lake City, or want to support a local news source on what’s happening in your community?

It won’t stop if it doesn’t stop – urban renewal continues, fears of recession are rampant. Last March, we released a photo article on the city’s construction site. Here’s what’s happening in January 2023:

New Construction Salt Lake City

New Construction Salt Lake City

At 200 South and Interstate, the Astra building, Utah’s longest-awaited, has risen to about 15 of its 39 floors and will offer 390 apartments.

More Skyscrapers Are Coming To Downtown Salt Lake City

At the northeast corner of Broadway (300 South) and 200 East, Worthington’s 31 stories and 359 residential units are being constructed. The construction team appears to be 5 stories above the ground.

The city’s Redevelopment Authority and partner Brinshore Development are completing a two-building project offering 190 apartments in a community building, 152 of which are affordable and between 20%-80% AMI.

We report on the Salt Palace Convention Center, and the West End and Hyatt Convention Center Hotel are the most notable projects.

But the less obvious dental filling between Salt Palace and Gateway Mall is also worth noting. Here’s our photo:

Salt Lake City International Airport Begins Construction Of New Concourse

Paper boxes (center, yellow vertical line) are rented, and a clear water improvement safari is picked up in the east parking lot on 200 South. Photo by Luke Garrett

Also to the south is 200 West, a renewal of the PEG development, offering 142 apartments for rent.

On the way to the University of Utah, several notable projects caught our attention The Lotus Republic is nearing completion in the former massage school space Last week, the owners won permission to open a bar called Citizen on the first floor of 33 S. 300 East.

New Construction Salt Lake City

At 500 East and South Temple, a historic (1949) office-to-residential conversion started by Ivory Homes and completed by the Ritchie Group is in the middle of its construction process. The early 1950s theme will include 121 apartments in two construction projects.

New Salt Lake City Water Reclamation Facility Enters Construction Phase

The Ritchie Group’s 121-unit historic restoration and new construction (right space) are under construction. Photo by Luc Gallot

Dr. Luke Garrett has been published in the Salt Lake Tribune and the Deseret News and has written features for the Salt Lake City Weekly City Guide and Westview. A former councilman for Salt Lake City’s 4th Ward, he lived in Salt Lake City and grew up in the Chicago area. Now is a great time to be in Salt Lake City. Here’s how the skyway will grow in 2021. Three more high-rises will be visible and a 39-story tower is planned, including an LDS Church office building (no restrictions on this).

(Francisco Czolset. Salt Lake Tribune) The climate of Salt Lake City will change in 2021, when many new buildings and mid-rise towers open in the capital of the state of Utah.

Need proof? Watch the skyline rise with three new high-rises in the heart of Utah’s capital city in 2021 and 2022:

Salt Lake City

In terms of height, none of these tall buildings will replace the city’s first two tallest buildings, the 26-story (422-foot) Wells Fargo Center and the 28-story (420-foot) LDS Church Office Tower on Main Street. (It is a myth that Salt Lake City had an ordinance against the construction of any large residential office higher than the North Temple in order to support early secular beliefs.)

However, the Wells Fargo Tower will lose its tall status when the planned 39-story, 448-foot Kensington Tower surpasses the others. Carl’s Jr. vacant at the northwest corner of State Street and 200 South.

(Salt Lake City, Courtesy Kensington Investment Co.) The 380-apartment luxury residential tower is designed to rise 448 feet, with an open roof deck and other high-end amenities.

New Construction Salt Lake City

On Monday, Houston-based global developer Hines unveiled plans for its new 31-story skyscraper at 150 S. Main, where the historic Utah Theater will be demolished in late 2019 under a deal signed by former Mayor Jackie Biskupski .

Moving To Salt Lake? 15 Great Neighborhoods In And Around Salt Lake City

If it goes up as planned, the 392-foot tower, to be called Main Street Apartments, will offer 400 new residences, including 40 affordable units, 355 market units and five penthouses. It will have a separate parking structure and a new wide corridor and park running west along the former main square, even Regent Street.

(Courtesy of Hines/Dewell Design Studio via Salt Lake City Planning Department) Global developer Hines has filed plans for a 31-story building on the former Utah Theater site on Main Street in Salt Lake City. Initial plans call for the tower at 150 S. to be called Main Street Apartments and have more than 400 apartments and stand 392 feet tall. (January 12, 2021)

The design calls for an open two-story lounge with a cylindrical plan in the middle of the 21st and 22nd floors and a private terrace on the roof of the tower’s luxury apartments.

Not even a global pandemic could drag Salt Lake City down this upward path. As construction is considered a priority under health guidelines, the city’s multi-year construction that went on last year will now continue through 2021 and beyond — pushing the city upward and outward with new buildings, office space and hundreds more homes. and hotel rooms. .

Utah Commercial Real Estate Development

While they are all abuzz with the coronavirus, about 50 major developments in the city’s pipeline have stalled due to COVID-19. A flood of new building permits and planning revisions has also weighed on City Hall as long-sought-after urban residents and housing have increased since 2010.

The new skyscraper will be clearly visible in the atmosphere around the hills of the city They will bring more height and density, new levels of residential and office comfort and unique architectural styles.

The new urban site was designed with a responsive ground floor to create a sense of flexibility in line with the city’s accepted standards prior to recent construction developments. Their facade and street relations have been carefully designed to make the city walk more attractive, with doors, large windows and street shops, restaurants and other attractive features.

New Construction Salt Lake City

“All of this seems to have the potential to make the outcome perfect,” said Brenda Case Scheer, a professor of architecture and planning at the University of Utah.

New Modular Construction Standards In Utah

Scheer and others insist that if downtown businesses are struggling, construction and an influx of new residents are likely to boost footfall and business activity while improving the city’s overall image.

Schell, head of the city’s planning commission, joked, “I’m waiting for Salt Lake City to become a city.” “Every city advertises its skyline,” with the Wasatch Mountains in the background, and it just so happened that we created a beautiful skyline. “

Other projects underway in 2021 will bring new mid-rise buildings, including the Post District, which includes more of the downtown area from 500 South to 600 South and from 300 West to 400 West. Although these may not significantly change the climate, their offices, shops and residences will continue to change the life of the city.

(Courtesy Skidmore, Owings & Merrill, via Salt Lake City) 95 will extend to the northeast corner of State Street in City Creek and 25 south of 100 in Salt Lake City.

Salt Lake City International Airport Passenger Terminal

The 25-story office tower at 100 South and State Streets will open in 2021. It was the work of City Creek Reserve, the development arm of The Church of Jesus Christ of Latter-day Saints, which also built a 25-story, 380-foot, 111-story building.

Called 95 State at City Creek, the building is intended to be the flagship of Class-A office space, a 515,000-square-foot office space that proponents say will reinvent the 9-to-5 experience and inspire health and well-being. of residents. It will also include a meeting room on the ground floor

At 393 feet, it will top 111 Main as the third-tallest building in the city’s current lineup.

New Construction Salt Lake City

Designed by Chicago architects Skidmore, Owings & Merrill, the tower also reinforces the LDS Church’s position as the city’s top office, retail and residential developer, including the neighboring City Creek Center, which opened in 2012.

Salt Lake Temple: Here’s What Happening As Renovation Enters Third Year

(Courtesy of Portman Architects) A new convention center hotel to be built at the northwest corner of 200 South and West Streets in Salt Lake City above the Salt Palace Convention Center. The 26-story hotel, to be named the Hyatt Regency Salt Lake City, will have 700 rooms and 60,000 square feet of meeting space and will be built for “seamless access” within the existing Salt Palace.

Salt Lake County tourism promoters have worked hard for ten years,

Salt lake city construction projects, new construction homes salt lake city, granite construction salt lake city, construction jobs salt lake city, okland construction salt lake city, construction salt lake city ut, new home construction salt lake city, new construction salt lake city utah, construction companies salt lake city, layton construction salt lake city, salt lake city road construction, salt lake city construction

Leave a Reply

Your email address will not be published. Required fields are marked *